PHOENIX CONTACT BPC 9102S BPC 9102S 1246285 PHOENIX CONTACT Safety Control System (SPS), PLCnext Control Programming: High-level langu.. View larger
Images are for illustrative purposes only. Please refer to data sheet for details

BPC 9102S 1246285 PHOENIX CONTACT Safety Control System (SPS), PLCnext Control Programming: High-level langu..

BPC 9102S

1246285

PHOENIX CONTACT

1 Pcs.

Safety Control System (SPS), PLCnext Control; Programming: High-level language and IEC 61131-3; Operating system: Yocto/Linux® (real-time); Programming tool: PLCnext Engineer, Eclipse®, Visual Studio®, MATLAB/® Simulink®; Processor: Intel® Core™ i7-10700TE, 8x 2 GHz (Standard).

Automation > PLC CPU-module
Control Systems (CST)

Product condition, packaging, certifications and applicable manufacturer warranty terms are confirmed with the quotation.

Request a Quote

Pricing and availability are confirmed for each enquiry. Add your required quantity to begin.

No account, online checkout or payment is required.

More info

Safety Control System (SPS), PLCnext Control; Programming: High-level language and IEC 61131-3; Operating system: Yocto/Linux® (real-time); Programming tool: PLCnext Engineer, Eclipse®, Visual Studio®, MATLAB/® Simulink®; Processor: Intel® Core™ i7-10700TE, 8x 2 GHz (Standard).

Product Datasheet

Electrica Online Product Datasheet Prepared from the current product description, catalog data and structured technical attributes.